DarkToken (DT)

Curr. Value 24 Hr. Change ($) 24 Hr. Change (%)
USD 0.00000000 0.00000000
BTC 0.00000000 0.00000000
EUR 0.00000000 0.00000000
GBP 0.00000000 0.00000000
JPY 0.00000000 0.00000000
Property Value
Last Updated 2019-10-22 22:21:32
Market Cap. $ 0
Volume 24h $ 0
Open 24h $ 0.00
Low/High 24h $ 0.00 - $ 0.00
DarkToken Market Analysis

More than 0.00 BTC worth of DT were exchanged in the DT/BTC market over the last 24 hours.


DarkToken (DT) Recent Trades

Source: CryptoCompare
Currently streaming from:
Market Type ID Price Quantity Total
Total Points
Points
0.28
Forum Posts
1
Comments
0
Crypto
10
Twitter
14
Reddit
0
Facebook
0
Code
3


DarkToken (DT) Social Media Activity

14 Twitter Points
Followers 99
Following 0
Favorites 0
Statuses 2
Lists 5
0 Reddit Points
Users 0
Subscribers 0
Posts Per Hour 0
Posts Per Day 0
Comments Per Hour 0
Comments Per Day 0
0 Facebook Points
Likes 0
Talking 0
 
3 Code Repository Points

DarkToken Historical Prices

Date Price (USD) Change
Rank Max Supply Algorithm Proof Type Start Date Difficulty Adjustment
23 0 NIST5 PoW/PoS 16/09/2014
Block Reward Reduction Block Number Network H/s Current Supply Block Reward Block Time
0 0 0 0 0

DarkToken aims to offer a refreshing new take on what a crypto-currency should be by detailing every aspect of the coin, from start to finish. DarkToken takes the next step in coin development by fixing it from the start. Rigorous, energy intensive mining over long periods of time, or even worse, short PoW flash-mines, are extremely detrimental to not only the environment, but the crypto community as a whole. Networks can be maintained perfectly using Proof of Stake.

DarkToken Mining Profitability
Profit Per Hour
$0.00
Mined/Hour
DT 0.00
Pool Cost/Hour
$ 0.00
Power Cost/Hour
$ 0.00
Profit Per Day
$0.00
Mined/Day
DT 0.00
Pool Cost/Day
$ 0.00
Power Cost/Day
$ 0.00
Profit Per Week
$0.00
Mined/Week
DT 0.00
Pool Cost/Week
$ 0.00
Power Cost/Week
$ 0.00
Profit Per Month
$0.00
Mined/Month
DT 0.00
Pool Cost/Month
$ 0.00
Power Cost/Month
$ 0.00
Profit Per Year
$0.00
Mined/Yesr
DT 0.00
Pool Cost/Year
$ 0.00
Power Cost/Year
$ 0.00
Hardware costs will
be paid off in: